Hudson logo
The job has never been built before, or the job is disabled.
The first build of the job is in progress.
The last build was successful.
The last build was successful. A new build is in progress.
The last build was successful but unstable.This is primarily used to represent test failures.
The last build was successful but unstable. A new build is in progress.
The last build fatally failed.
The last build fatally failed. A new build is in progress.
Job health is over 80%. You can hover the mouse over the job's icon for a more detailed explanation.
Job health is over 60% and up to 80%. You can hover the mouse over the job's icon for a more detailed explanation.
Job health is over 40% and up to 60%. You can hover the mouse over the job's icon for a more detailed explanation.
Job health is over 20% and up to 40%. You can hover the mouse over the job's icon for a more detailed explanation.
Job health is 20% or less. You can hover the mouse over the job's icon for a more detailed explanation.

Powered by Hudson Open Source Continuous Integration Server from the Eclipse Foundation